Replacement of the ventilation system at Kytösuontie 9 (30.11.2010)
The first stage of the replacement of the ventilation system in the B building of the dental clinic has been completed. The second stage will begin in early 2011. The centralised ventilation equipment in the attic of the B wing will be replaced with floor-specific ventilation units, and the floors will be separated into two areas. Stage two of the project focuses on floors one through three. The outdated automated ventilation system will be replaced during the renovation and connected to a central control module.
